Browsing by Subject "chute raises"
Now showing 1 - 1 of 1
- Results Per Page
- Sort Options
Item type:Article, Access status: Open Access , Przedsiębiorstwo Budowy Szybów - nietypowe zadania w budownictwie szybowym(2007) Rusek, Janusz; Sanocki, TomaszIn December 2003 Kopex SA concluded a Contract for main shaft deepening, construction and furnishing of support excavations at Cayeli Bakir Isletmeleri Zink and Copper Ore Mine in Turkey. From December 2003 till August 2007, PBSz SA carried out complete work in mining and mechanical branches, within the confines of a project consisting in opening-out a new production level. The scope of work included: deepening by 286 m an operating production shaft of 5.5 m diameter, construction and furnishing of shaft station room, skip pocket, conveyor drift, electric substation room and main pump room on the new production level, sinking of oblique ore passes and a ventilation raise, driving approx. 1000 m of stone headings with the application of shotcreted anchor support. During the shaft and ore pass sinking, the construction of support structures and driving of headings procedure employing the techniques of large diameter hole drilling and blasting were applied at a wide range. The procedure applied allowed the carrying out non-standard tasks in shaft construction.
