Termomodernizacja obiektu z wykorzystaniem biwalentnego systemu grzewczego
Defence Date
2011-07-13
Authors
Supervisors:
Reviewers:
Access rights
Other title
Building thermomodernization in bivalent heating system
Resource type
Defence details
Description
Abstract
The purpose of this study was to conduct a residential facility in thermo bivalent system. On the basis of a residential building and using a program to calculate OZC designated facility design heating load for the two states before and after renovation. It was the basis for conducting building thermomodernization. The resulting demand for heat by thermo was used to determine the appropriate operating parameters of the central heating system and domestic hot water. Based on these results matched the appropriate heat source (heat pump and condensing boiler) and the principle of mutual cooperation. An analysis of economic systems using factor SPTB and summarized the economic profitability of the project.
Celem niniejszej pracy było przeprowadzenie termomodernizacji obiektu mieszkalnego w układzie grzewczym biwalentnym. Na podstawie danych budynku mieszkalnego i przy wykorzystaniu programu do obliczeń OZC wyznaczono projektowe obciążenie cieplne obiektu dla dwóch stanów przed i po termomodernizacji. Było ono podstawą do przeprowadzania termomodernizacji budowlanej. Otrzymane zapotrzebowanie na energię cieplną po termomodernizacji wykorzystano do określenia odpowiednich parametrów pracy układu centralnego ogrzewania oraz ciepłej wody użytkowej. W oparciu o powyższe wyniki dobrano odpowiednie źródła ciepła (pompę ciepła i kocioł kondensacyjny) oraz zasadę ich wzajemnej współpracy. Przeprowadzono analizę ekonomiczną systemów wykorzystując współczynnik SPTB oraz podsumowano opłacalność ekonomiczną przedsięwzięcia.

