A case study of the TS-26 tunnel – the longest non-urban road tunnel in Poland using NATM technology
Date
Presentation Date
Editor
Authors
Other contributors
Other title
Resource type
Version
Pagination/Pages:
Research Project
Description
Abstract
The article describes in detail the legal, technical and geological conditions faced by the designers and contractors of the TS-26 tunnel, located within the S3 expressway. The tunnel, which is the longest non-urban road tunnel in Poland, was constructed using the New Austrian Tunnel Construction Method (NATM). The project represented a considerable engineering challenge due to the geological conditions and the need to ensure the highest safety standards. The article describes the design process, including detailed geological analyses, and the construction phases of the tunnel, which included excavation, construction of the primary and secondary lining, and the installation of advanced safety systems. The TS-26 tunnel is a key element of the road infrastructure that will significantly improve communication in the region and support the economic development of Lower Silesia.