Repository logo
Article

Pollution load assessment in the form of TSS and COD emitted from an urbanized catchment in the aspect of administrative pollutant discharge fees on the example of the activity of the J1 CSO in Lodz (Poland)

creativeworkseries.issn2299-8004
dc.contributor.authorBrzezińska, Agnieszka
dc.contributor.authorWiankowski, Lukasz
dc.date.available2025-08-05T09:51:08Z
dc.date.issued2023
dc.description.abstractThe article presents the possibility of reducing fees for wastewater discharge from combined sewer overflows (CSOs) into the aquatic environment by minimizing the load emission of total suspended solids (TSS) and chemical oxygen demand (COD). The analysis was conducted based on limiting the wastewater volume discharged to the receiving water by one of the viable options, i.e., raising the overflow crest. The assessment was made on the example of the functioning J1 CSO in Lodz (in Polish: Łódź) in the years 2013–2015. An analysis of rainfall recorded in the J1 catchment area was also performed for this period. For the determination of the TSS and COD load emitted to the receiver, a predictive model based on rainfall parameters and the volume of discharged wastewater was used. To determine the wastewater volume emitted during individual activations of the J1 overflow, the model of the sewer network serving this catchment was calibrated in the EPA SWMM software. Simulations were conducted, considering different heights of the weir crest (static change). The results of the analyzes showed that raising the crest by 5 cm reduced the total fee for the J1 activity by 35% compared to its existing height in 2013 and about 40% for 2015. Raising the crest by 10 cm in 2015 enabled, for example, the J1 overflow activity to be in accordance with the applicable law. Reducing the amount of wastewater discharged to the receiver by using the overflow crest height adjustment method presented in the article may bring measurable financial and ecological benefits.en
dc.description.placeOfPublicationKraków
dc.description.versionwersja wydawnicza
dc.identifier.doihttps://doi.org/10.7494/geol.2023.49.4.375
dc.identifier.eissn2353-0790
dc.identifier.issn2299-8004
dc.identifier.urihttps://repo.agh.edu.pl/handle/AGH/114182
dc.language.isoeng
dc.publisherWydawnictwa AGH
dc.relation.ispartofGeology, Geophysics & Environment
dc.rightsAttribution 4.0 International
dc.rights.accessotwarty dostęp
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/legalcode
dc.subjectenvironmental engineeringen
dc.subjectCSO managementen
dc.subjectsewer systemen
dc.subjectweir crest levelen
dc.subjectenvironmental pollutant discharge feesen
dc.titlePollution load assessment in the form of TSS and COD emitted from an urbanized catchment in the aspect of administrative pollutant discharge fees on the example of the activity of the J1 CSO in Lodz (Poland)en
dc.title.relatedGeology, Geophysics & Environmenten
dc.typeartykuł
dspace.entity.typePublication
publicationissue.issueNumberNo. 4
publicationissue.paginationpp. 375-387
publicationvolume.volumeNumberVol. 49
relation.isJournalIssueOfPublicatione5b5f50f-9bdb-4e88-a65f-a353a4f82f75
relation.isJournalIssueOfPublication.latestForDiscoverye5b5f50f-9bdb-4e88-a65f-a353a4f82f75
relation.isJournalOfPublicationb0bafc1e-4fd1-4ff1-822c-c1a78e14c892

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
geol.2023.49.4.375.pdf
Size:
1.02 MB
Format:
Adobe Portable Document Format