Repository logo
Article

The creation of a new transportation route near the Crystal Grotto in the «Wieliczka» Salt Mine through the construction of a fore-shaft equipped with a transportation device

Loading...
Thumbnail Image

Date

Presentation Date

Editor

Other contributors

Access rights

Access: otwarty dostęp
Rights: CC BY 4.0
Attribution 4.0 International

Attribution 4.0 International (CC BY 4.0)

Other title

Resource type

Version

wersja wydawnicza
Item type:Journal Issue,

Pagination/Pages:

pp. 35-43

Research Project

Event

Description

Abstract

This article presents the planned fore-shaft construction between the 2nd upper and 2nd lower levels equipped with a hoisting device for materials transportation. The main aim of this venture was to create a means of transporting materials used in the process of protecting and maintaining the Crystal Grotto. There is currently no vertical connection between the 2nd upper and 2nd lower level. As a result, all material transportation is performed manually over the incline paths.

Access rights

Access: otwarty dostęp
Rights: CC BY 4.0
Attribution 4.0 International

Attribution 4.0 International (CC BY 4.0)