Repository logo
Article

Difficulties related to the renovation of the reinforcement of the V shaft at PGG Oddział KWK Ruda Ruch Bielszowice

Loading...
Thumbnail Image

Date

Presentation Date

Editor

Other contributors

Access rights

Access: otwarty dostęp
Rights: CC BY 4.0
Attribution 4.0 International

Attribution 4.0 International (CC BY 4.0)

Other title

Trudności związane z remontem zbrojenia szybu V w PGG Oddział KWK Ruda Ruch Bielszowice

Resource type

Version

wersja wydawnicza
Item type:Journal Issue,

Pagination/Pages:

pp. 39-46

Research Project

Event

Description

Bibliogr. s. 46.

Abstract

The article presents an analysis of the possibility of carrying out repairs of shaft reinforcement without limiting its transport tasks, with operating parameters in accordance with the technical documentation of the shaft hoist, specified technical condition of the girders and guides, using the capital of knowledge and experience in maintaining the required level of safety for guiding the extraction vessels in conditions of the acceptable wear of guides and girders included in the mine shaft hoist documentation.

Access rights

Access: otwarty dostęp
Rights: CC BY 4.0
Attribution 4.0 International

Attribution 4.0 International (CC BY 4.0)