Repository logo
Article

Modelling multi-period set-up times in the proportional lot-sizing problem

Loading...
Thumbnail Image

Date

Presentation Date

Editor

Other contributors

Access rights

Access: otwarty dostęp
Rights: CC BY 4.0
Attribution 4.0 International

Attribution 4.0 International (CC BY 4.0)

Other title

Resource type

Version

wersja wydawnicza

Pagination/Pages:

pp. 15-35

Research Project

Event

Description

Abstract

This paper presents new mixed integer programming models for the Proportional Lot-Sizing Problem (PLSP) with set-up times longer than a period. Proposed models explicitly calculate the distribution of times amongst products in periods with a changeover and determine a final period for every set-up operation. Presented results prove that the proposed models are easier to solve using standard MIP methods than already known models.

Access rights

Access: otwarty dostęp
Rights: CC BY 4.0
Attribution 4.0 International

Attribution 4.0 International (CC BY 4.0)